What we learned from a winter on site

Written by

in

Three storms, one flooded trench and a roofer who would not be hurried.

How it came together

We started with a measured survey and a long conversation about how the place is used through the year. The drawings changed four times before anything was ordered.

  • Survey and brief
  • Three options, costed
  • One builder, start to finish

It feels as if it has always been here.

The owner, a year on

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *